Re: Certification Test - Messaging from Touchpanel
Meh, they essentially gave us 6 months to complete the exam, which was plenty of procrastination time. If it was open ended I may have never had the motivation to actually get it done...
It did suck having to take Programming for Certification a second time, but.. I had a different instructor and learned different things, and I always love a "Crestron Vacation."
toggle quoted message
Show quoted text
--- In Crestron@..., "eagrubbs" <eagrubbs@...> wrote: What!!?? Good grief they are killing me. That isn't fair to all the other certified people.....wow. That is all I have to say on this one.
|
That sounds like a good possibility.
-Kevin
toggle quoted message
Show quoted text
On May 14, 2013, at 12:29, Neil Dorin <neildorin@...> wrote: My go to solution for EX gateways is Cresnet power (just 24V and GND) and ethernet comms. They are picky about PoE but I prefer their response and manageablity over ethernet.
On Tue, May 14, 2013 at 9:10 AM, Thomas <tluczywo@...> wrote:
**
I've done projects with gateways operating via Cresnet (8 remotes, 6 remotes), no issues.
Tom L.
--- In Crestron@..., Nick Mitchell <nick@...> wrote:
Kevin,
Don't switch them to cresnet. We saw lots of performance issues with gateways and cresnet. Invest in a UPS so it doesn't loose power lol.
Nick
Sent from my eMail.
On May 14, 2013, at 9:18 AM, Kevin Keenan <kevinfkeenan@...> wrote:
I have a project with 7 MLX-3 s and three gateways connected to a CP3 via a
Pakedge POE switch. Every time the customer loses power, the gateways lock
up. (They usually blame the remotes, but pulling the batteries or rebooting
the MLX-3 does not help) We have to cycle the power on the gateways and wait about 10 minutes, then all is fine.
I am thinking about rewiring the gateways to use Cresnet instead of Ethernet.
-Kevin
On May 13, 2013, at 18:51, "chrish172003" <chris@...> wrote:
just out of interest has anyone experienced any lockups with the mlx-3 on
the mc3?
panel comes unresponsive and then you have to reboot the gway to or
pull
the batteries on the panel to get it to work again
[Non-text portions of this message have been removed]
[Non-text portions of this message have been removed] [Non-text portions of this message have been removed]
------------------------------------
Check out the Files area for useful modules, documents, and drivers.
A contact list of Crestron dealers and programmers can be found in the Database area. Yahoo! Groups Links
|
My go to solution for EX gateways is Cresnet power (just 24V and GND) and ethernet comms. They are picky about PoE but I prefer their response and manageablity over ethernet. On Tue, May 14, 2013 at 9:10 AM, Thomas <tluczywo@...> wrote: **
I've done projects with gateways operating via Cresnet (8 remotes, 6 remotes), no issues.
Tom L.
--- In Crestron@..., Nick Mitchell <nick@...> wrote:
Kevin,
Don't switch them to cresnet. We saw lots of performance issues with gateways and cresnet. Invest in a UPS so it doesn't loose power lol.
Nick
Sent from my eMail.
On May 14, 2013, at 9:18 AM, Kevin Keenan <kevinfkeenan@...> wrote:
I have a project with 7 MLX-3 s and three gateways connected to a CP3 via a
Pakedge POE switch. Every time the customer loses power, the gateways lock
up. (They usually blame the remotes, but pulling the batteries or rebooting
the MLX-3 does not help) We have to cycle the power on the gateways and wait about 10 minutes, then all is fine.
I am thinking about rewiring the gateways to use Cresnet instead of Ethernet.
-Kevin
On May 13, 2013, at 18:51, "chrish172003" <chris@...> wrote:
just out of interest has anyone experienced any lockups with the mlx-3 on
the mc3?
panel comes unresponsive and then you have to reboot the gway to or
pull
the batteries on the panel to get it to work again
[Non-text portions of this message have been removed]
[Non-text portions of this message have been removed]
[Non-text portions of this message have been removed]
|
Re: Certification Test - Messaging from Touchpanel
What!!?? Good grief they are killing me. That isn't fair to all the other certified people.....wow. That is all I have to say on this one.
toggle quoted message
Show quoted text
--- In Crestron@..., Nate <soccerquist@...> wrote: I just took the advanced class the first of March and I also due to my work load haven't been able to spend enough time that I would be able to finish by my deadline. So I emailed Crestron to get an extension and found out that they have dropped the 3 month deadline. I'm not sure how far back that will count for but I was relieved to hear I had more time to finish mine.
Nate L.
Sent from my iPad
On May 14, 2013, at 10:50 AM, "cyberbri24" <cyberbri24@...> wrote:
I guess it's my time to chime in lol...
Been programming for 12 years. Starting out in resi and stayed there for most of that time. Largest system was 22 TP, 20 zones of A/V, 250K theater within, full smart home (HVAC, SHADES, JANDY, CCTV, you name it they had it), and 6 full racks of gear totaling about $1 mil. This was all done only having Essentials experience. From there and attending Intermediate class, everything was easier because most systems was 1-6 rooms. After the market crash I moved over to Commerical because companies have annual budgets to spend and I got in with a few A/V commerical companies always needing programming. I finally took my Cert class very recently but my current workload (which is a good thing)has kept me from finishing my exam. I will finish it at some point, just not sure if they make me attend another class before that happens? Has anyone gone past the 3 months date? I have been an admin of a few large RVSE systems. From 150 to 250 rooms, I have yet to really use all the features such as room messaging or scheduling as the client always had other SW for making the rooms available so I never needed to worry about it. The clients mostly look for managing and keep track of scheduling the events to shutdown rooms for better bulb life, knowing the lamp hours for PM care and helping assist a user by using the x-panel feature. The rooms need occupency sensors and IP cameras to help aid in knowing if a room is really in use or not or just left on IMO.
Question I have, is there going to be a qwerty keyboard released yet for Core 3UI anytime soon?
Thanks, cyberbri
--- In Crestron@..., "jbudz1977" <jbudz1977@> wrote:
RV Express has a Help Message and Help Response Text Field...
--- In Crestron@..., Lincoln King-Cliby <lincoln@> wrote:
Yeah, but I don't think RV Express (RV6) supports the messaging, etc. of RV7 / RV SE... I could be wrong since it's been more than a few years since I've seen anyone do RV SE so maybe that capability has been added [or has been there all along and, as I said, I just have never had a need for it]
Lincoln
|
Re: TPMC-12 Cresnet problem
I found that setting when I was having a look around earlier, it was set to enabled. The panel was working perfectly up until the end of last week then developed this problem.
toggle quoted message
Show quoted text
--- In Crestron@..., "Chip" <cfm@...> wrote:
For reasons I can't fathom, this panel (I'm sure it must be on others as well) has a "Cresnet On/Off" setting in the setup pages...
:(
- Chip
--- In Crestron@..., "roray32" <roray.stewart@> wrote:
Hi,
I have TPMC-12 which appears to have developed a problem with its Cresnet connection. In toolbox I can see the panel on IP, looking at the AV2 it's connected to it lists no Cresnet devices attached. I have re-uploading the code and have also re-uploaded the firmware to the panel but this has made no difference. I can see the code on the panel but when operating it just carries out page flips, doesn't control the system in any way.
Panel is running firmware: 1.00.02.90
Any ideas as to what else I can check or try before I send it back for repair.
Thanks Roray
|
Re: AV2 rebooting continously after program upload
the only other module is the Tandberg Cisco. Rest is just logic symbols.
toggle quoted message
Show quoted text
--- In Crestron@..., "eagrubbs" <eagrubbs@...> wrote: Well that can't be your problem. What other simpl+ stuff do yo have going on?
--- In Crestron@..., "coolaiddrinker" <coolaiddrinker@> wrote:
i have biamp modules in the program only 3 dialer, mic mute and vol control v5.2
--- In Crestron@..., "eagrubbs" <eagrubbs@> wrote:
What is your dsp in this system? On the av2 I had issues with, the program was using BSS audio modules. The newest modules off of the BSS site would lock that av2 everytime. Reverted to some older modules and no more problems. I could load that same program that would lock the av2 and it would run fine on MPC-M10. I still would like to know why the av2 would lock though. The program was really small too: 80 symbols, 314 digital, 24 analog, 25 serial, so I know it wasn't out of memory.
|
Re: TPMC-12 Cresnet problem
For reasons I can't fathom, this panel (I'm sure it must be on others as well) has a "Cresnet On/Off" setting in the setup pages...
:(
- Chip
toggle quoted message
Show quoted text
--- In Crestron@..., "roray32" <roray.stewart@...> wrote: Hi,
I have TPMC-12 which appears to have developed a problem with its Cresnet connection. In toolbox I can see the panel on IP, looking at the AV2 it's connected to it lists no Cresnet devices attached. I have re-uploading the code and have also re-uploaded the firmware to the panel but this has made no difference. I can see the code on the panel but when operating it just carries out page flips, doesn't control the system in any way.
Panel is running firmware: 1.00.02.90
Any ideas as to what else I can check or try before I send it back for repair.
Thanks Roray
|
Re: AV2 rebooting continously after program upload
I had an issue where a comment with "" in the parameter field caused reboots.
I didn't want it to put anything into console. I was only using as a placeholder in the logic tree, and as a reminder as I built up the project and added rooms, and devices, I needed to initialize their crosspoint IDs. Otherwise it was upload, test, $(*@#&(*&, add the ID, upload.
Taking out the null comment fixed it.
toggle quoted message
Show quoted text
On Tue, May 14, 2013 at 10:19 AM, eagrubbs <eagrubbs@...> wrote: **
Well that can't be your problem. What other simpl+ stuff do yo have going on?
--- In Crestron@..., "coolaiddrinker" <coolaiddrinker@...> wrote:
i have biamp modules in the program only 3 dialer, mic mute and vol control v5.2
--- In Crestron@..., "eagrubbs" <eagrubbs@> wrote:
What is your dsp in this system? On the av2 I had issues with, the
program was using BSS audio modules. The newest modules off of the BSS site would lock that av2 everytime. Reverted to some older modules and no more problems. I could load that same program that would lock the av2 and it would run fine on MPC-M10. I still would like to know why the av2 would lock though. The program was really small too: 80 symbols, 314 digital, 24 analog, 25 serial, so I know it wasn't out of memory.
|
Re: TPMC-12 Cresnet problem
I should of also mentioned that I've tried another panel on the the cabling and it works fine.
toggle quoted message
Show quoted text
--- In Crestron@..., "castor_97" <ecastor@...> wrote: have you checked the wireing? sounds like there might be a loose connection somewhere.
--- In Crestron@..., "roray32" <roray.stewart@> wrote:
Hi,
I have TPMC-12 which appears to have developed a problem with its Cresnet connection. In toolbox I can see the panel on IP, looking at the AV2 it's connected to it lists no Cresnet devices attached. I have re-uploading the code and have also re-uploaded the firmware to the panel but this has made no difference. I can see the code on the panel but when operating it just carries out page flips, doesn't control the system in any way.
Panel is running firmware: 1.00.02.90
Any ideas as to what else I can check or try before I send it back for repair.
Thanks Roray
|
SONY 4K XBR 84X900 series
Hi guys,
Just landed a nice programming job... the only problem ...
i have to integrate a sony 4K Tv, and i can't find any doc of the protocol... since the tv has some proprietary functions, i was looking for some kind of a sony document with what is what... and what's it doing...
I'll get the tv on the jobsite and i wanted to prepare my modules before hand...
If anyone is a sony dealer and have some info on this subject, it'll be greatly appreciated...
Thank you,
Stephane,
|
Re: AV2 rebooting continously after program upload
Well that can't be your problem. What other simpl+ stuff do yo have going on?
toggle quoted message
Show quoted text
--- In Crestron@..., "coolaiddrinker" <coolaiddrinker@...> wrote: i have biamp modules in the program only 3 dialer, mic mute and vol control v5.2
--- In Crestron@..., "eagrubbs" <eagrubbs@> wrote:
What is your dsp in this system? On the av2 I had issues with, the program was using BSS audio modules. The newest modules off of the BSS site would lock that av2 everytime. Reverted to some older modules and no more problems. I could load that same program that would lock the av2 and it would run fine on MPC-M10. I still would like to know why the av2 would lock though. The program was really small too: 80 symbols, 314 digital, 24 analog, 25 serial, so I know it wasn't out of memory.
|
Re: Certification Test - Messaging from Touchpanel
I just took the advanced class the first of March and I also due to my work load haven't been able to spend enough time that I would be able to finish by my deadline. So I emailed Crestron to get an extension and found out that they have dropped the 3 month deadline. I'm not sure how far back that will count for but I was relieved to hear I had more time to finish mine. Nate L. On May 14, 2013, at 10:50 AM, "cyberbri24" <cyberbri24@...> wrote: I guess it's my time to chime in lol...
Been programming for 12 years. Starting out in resi and stayed there for most of that time. Largest system was 22 TP, 20 zones of A/V, 250K theater within, full smart home (HVAC, SHADES, JANDY, CCTV, you name it they had it), and 6 full racks of gear totaling about $1 mil. This was all done only having Essentials experience. From there and attending Intermediate class, everything was easier because most systems was 1-6 rooms. After the market crash I moved over to Commerical because companies have annual budgets to spend and I got in with a few A/V commerical companies always needing programming. I finally took my Cert class very recently but my current workload (which is a good thing)has kept me from finishing my exam. I will finish it at some point, just not sure if they make me attend another class before that happens? Has anyone gone past the 3 months date? I have been an admin of a few large RVSE systems. From 150 to 250 rooms, I have yet to really use all the features such as room messaging or scheduling as the client always had other SW for making the rooms available so I never needed to worry about it. The clients mostly look for managing and keep track of scheduling the events to shutdown rooms for better bulb life, knowing the lamp hours for PM care and helping assist a user by using the x-panel feature. The rooms need occupency sensors and IP cameras to help aid in knowing if a room is really in use or not or just left on IMO.
Question I have, is there going to be a qwerty keyboard released yet for Core 3UI anytime soon?
Thanks, cyberbri
--- In Crestron@..., "jbudz1977" <jbudz1977@...> wrote:
RV Express has a Help Message and Help Response Text Field...
--- In Crestron@..., Lincoln King-Cliby <lincoln@> wrote:
Yeah, but I don't think RV Express (RV6) supports the messaging, etc. of RV7 / RV SE... I could be wrong since it's been more than a few years since I've seen anyone do RV SE so maybe that capability has been added [or has been there all along and, as I said, I just have never had a need for it]
Lincoln
[Non-text portions of this message have been removed]
|
I've done projects with gateways operating via Cresnet (8 remotes, 6 remotes), no issues.
Tom L.
toggle quoted message
Show quoted text
--- In Crestron@..., Nick Mitchell <nick@...> wrote: Kevin,
Don't switch them to cresnet. We saw lots of performance issues with gateways and cresnet. Invest in a UPS so it doesn't loose power lol.
Nick
Sent from my eMail.
On May 14, 2013, at 9:18 AM, Kevin Keenan <kevinfkeenan@...> wrote:
I have a project with 7 MLX-3 s and three gateways connected to a CP3 via a Pakedge POE switch. Every time the customer loses power, the gateways lock up. (They usually blame the remotes, but pulling the batteries or rebooting the MLX-3 does not help) We have to cycle the power on the gateways and wait about 10 minutes, then all is fine.
I am thinking about rewiring the gateways to use Cresnet instead of Ethernet.
-Kevin
On May 13, 2013, at 18:51, "chrish172003" <chris@...> wrote:
just out of interest has anyone experienced any lockups with the mlx-3 on the mc3?
panel comes unresponsive and then you have to reboot the gway to or pull the batteries on the panel to get it to work again
[Non-text portions of this message have been removed]
[Non-text portions of this message have been removed]
|
Re: AV2 rebooting continously after program upload
i have biamp modules in the program only 3 dialer, mic mute and vol control v5.2
toggle quoted message
Show quoted text
--- In Crestron@..., "eagrubbs" <eagrubbs@...> wrote:
What is your dsp in this system? On the av2 I had issues with, the program was using BSS audio modules. The newest modules off of the BSS site would lock that av2 everytime. Reverted to some older modules and no more problems. I could load that same program that would lock the av2 and it would run fine on MPC-M10. I still would like to know why the av2 would lock though. The program was really small too: 80 symbols, 314 digital, 24 analog, 25 serial, so I know it wasn't out of memory.
|
Re: I have a shirt.... Old Crestron Swirl
DMPS update, yes you have some time on your hands, but wait until you do a fully loaded 32x32 to the newest firmware. You might as well take the day off.
I do remember that swirl, the solid color looks better.
toggle quoted message
Show quoted text
--- In Crestron@..., Tom Mclaughlin <tmclaughlin@...> wrote: Hea,
Does anyone remember the old Crestron Swirl? It's logo was the original 'Rainbow' colors before Crestron changed to solid "anti-rainbow" (all blue or white). Denim Crestron Certified with the old Swirl, and I was wondering....
Do the Crestron Swirls in Australia or Southern Hemisphere go Counterclockwise? Just wondering if it was an urban legend.....
Sorry for the BS post, I have a lot of time on my hands...
updating DMPS300s.
Tom
|
GreenPoint TDI accepting applications
GreenPoint TDI, a leading commercial control systems software company in Phoenix, Arizona is currently accepting applications for apprentice and experienced programmers/configuration Field techs in the Las Vegas and Phoenix markets. Please feel free to email me with requirement questions and any information requests. scotts@...
|
I have a shirt.... Old Crestron Swirl
Hea,
Does anyone remember the old Crestron Swirl? It's logo was the original 'Rainbow' colors before Crestron changed to solid "anti-rainbow" (all blue or white). Denim Crestron Certified with the old Swirl, and I was wondering....
Do the Crestron Swirls in Australia or Southern Hemisphere go Counterclockwise? Just wondering if it was an urban legend.....
Sorry for the BS post, I have a lot of time on my hands...
updating DMPS300s.
Tom
|
Re: Certification Test - Messaging from Touchpanel
Really? Even the tpmc-4smd? I will have to research this.
Nick
Sent from my eMail.
toggle quoted message
Show quoted text
On May 14, 2013, at 10:54 AM, Neil Dorin <neildorin@...> wrote: Every Core3UI panel has a qwerty keyboard built in.... On 2013-05-14, at 8:50 AM, "cyberbri24" <cyberbri24@...> wrote: I guess it's my time to chime in lol...
Been programming for 12 years. Starting out in resi and stayed there for most of that time. Largest system was 22 TP, 20 zones of A/V, 250K theater within, full smart home (HVAC, SHADES, JANDY, CCTV, you name it they had it), and 6 full racks of gear totaling about $1 mil. This was all done only having Essentials experience. From there and attending Intermediate class, everything was easier because most systems was 1-6 rooms. After the market crash I moved over to Commerical because companies have annual budgets to spend and I got in with a few A/V commerical companies always needing programming. I finally took my Cert class very recently but my current workload (which is a good thing)has kept me from finishing my exam. I will finish it at some point, just not sure if they make me attend another class before that happens? Has anyone gone past the 3 months date? I have been an admin of a few large RVSE systems. From 150 to 250 rooms, I have yet to really use all the features such as room messaging or scheduling as the client always had other SW for making the rooms available so I never needed to worry about it. The clients mostly look for managing and keep track of scheduling the events to shutdown rooms for better bulb life, knowing the lamp hours for PM care and helping assist a user by using the x-panel feature. The rooms need occupency sensors and IP cameras to help aid in knowing if a room is really in use or not or just left on IMO. Question I have, is there going to be a qwerty keyboard released yet for
Core 3UI anytime soon? Thanks, cyberbri
--- In Crestron@..., "jbudz1977" <jbudz1977@...> wrote:
RV Express has a Help Message and Help Response Text Field...
--- In Crestron@..., Lincoln King-Cliby <lincoln@> wrote:
Yeah, but I don't think RV Express (RV6) supports the messaging, etc.
of RV7 / RV SE... I could be wrong since it's been more than a few years since I've seen anyone do RV SE so maybe that capability has been added [or has been there all along and, as I said, I just have never had a need for it] Lincoln
[Non-text portions of this message have been removed]
|
Re: Certification Test - Messaging from Touchpanel
Every Core3UI panel has a qwerty keyboard built in.... On 2013-05-14, at 8:50 AM, "cyberbri24" <cyberbri24@...> wrote: I guess it's my time to chime in lol...
Been programming for 12 years. Starting out in resi and stayed there for most of that time. Largest system was 22 TP, 20 zones of A/V, 250K theater within, full smart home (HVAC, SHADES, JANDY, CCTV, you name it they had it), and 6 full racks of gear totaling about $1 mil. This was all done only having Essentials experience. From there and attending Intermediate class, everything was easier because most systems was 1-6 rooms. After the market crash I moved over to Commerical because companies have annual budgets to spend and I got in with a few A/V commerical companies always needing programming. I finally took my Cert class very recently but my current workload (which is a good thing)has kept me from finishing my exam. I will finish it at some point, just not sure if they make me attend another class before that happens? Has anyone gone past the 3 months date? I have been an admin of a few large RVSE systems. From 150 to 250 rooms, I have yet to really use all the features such as room messaging or scheduling as the client always had other SW for making the rooms available so I never needed to worry about it. The clients mostly look for managing and keep track of scheduling the events to shutdown rooms for better bulb life, knowing the lamp hours for PM care and helping assist a user by using the x-panel feature. The rooms need occupency sensors and IP cameras to help aid in knowing if a room is really in use or not or just left on IMO.
Question I have, is there going to be a qwerty keyboard released yet for Core 3UI anytime soon?
Thanks, cyberbri
--- In Crestron@..., "jbudz1977" <jbudz1977@...> wrote:
RV Express has a Help Message and Help Response Text Field...
--- In Crestron@..., Lincoln King-Cliby <lincoln@> wrote:
Yeah, but I don't think RV Express (RV6) supports the messaging, etc. of RV7 / RV SE... I could be wrong since it's been more than a few years since I've seen anyone do RV SE so maybe that capability has been added [or has been there all along and, as I said, I just have never had a need for it]
Lincoln
[Non-text portions of this message have been removed]
|
Re: Certification Test - Messaging from Touchpanel
I guess it's my time to chime in lol...
Been programming for 12 years. Starting out in resi and stayed there for most of that time. Largest system was 22 TP, 20 zones of A/V, 250K theater within, full smart home (HVAC, SHADES, JANDY, CCTV, you name it they had it), and 6 full racks of gear totaling about $1 mil. This was all done only having Essentials experience. From there and attending Intermediate class, everything was easier because most systems was 1-6 rooms. After the market crash I moved over to Commerical because companies have annual budgets to spend and I got in with a few A/V commerical companies always needing programming. I finally took my Cert class very recently but my current workload (which is a good thing)has kept me from finishing my exam. I will finish it at some point, just not sure if they make me attend another class before that happens? Has anyone gone past the 3 months date? I have been an admin of a few large RVSE systems. From 150 to 250 rooms, I have yet to really use all the features such as room messaging or scheduling as the client always had other SW for making the rooms available so I never needed to worry about it. The clients mostly look for managing and keep track of scheduling the events to shutdown rooms for better bulb life, knowing the lamp hours for PM care and helping assist a user by using the x-panel feature. The rooms need occupency sensors and IP cameras to help aid in knowing if a room is really in use or not or just left on IMO.
Question I have, is there going to be a qwerty keyboard released yet for Core 3UI anytime soon?
Thanks, cyberbri
toggle quoted message
Show quoted text
--- In Crestron@..., "jbudz1977" <jbudz1977@...> wrote: RV Express has a Help Message and Help Response Text Field...
--- In Crestron@..., Lincoln King-Cliby <lincoln@> wrote:
Yeah, but I don't think RV Express (RV6) supports the messaging, etc. of RV7 / RV SE... I could be wrong since it's been more than a few years since I've seen anyone do RV SE so maybe that capability has been added [or has been there all along and, as I said, I just have never had a need for it]
Lincoln
|