Locked
Re: MQTT Connection in JMRI
This is pretty much how JMRI works already using system names. Bob
By
Bob Jacobsen
·
#154444
·
|
Locked
Making use of Timtabling
I am reading the Timetable introduction prior to trying it out.? I am on version 4.12 and I will probably hold off doing anything until 4.14 is issued since I don't really want to do 2 upgrades. ? I
By
Iain
·
#154443
·
|
Locked
Re: setting up version 4.12
Thanks Nigel, I have the proper USB cable to go from the Power Pro command station to my Mac since I was using it on another older Mac and an older version of Decoder Pro. I downloaded the version
By
Perry Squier <wpsquier@...>
·
#154442
·
|
Locked
Re: JMRI Locking up
Chris: While turntable control is no longer a problem you are concerned with, for others following this conversation, it may be useful to know that the details of turntable control are embedded in the
By
Jan Carr
·
#154441
·
|
Locked
Re: Timetabling
#timetable-tool
OK.? My wife is one of those clever mathematicians who write papers about error propagation: hence my concern.
By
Iain
·
#154440
·
|
Locked
Re: MQTT Connection in JMRI
From: Bob Jacobsen Here¡¯s a concrete proposal to consider. _Please_ add/change/remove until we can get some kind of consensus! Happy to work during the holidays on whatever emerges. Proposed updates
By
Donald
·
#154439
·
|
Locked
Re: Timetabling
#timetable-tool
Iain, The calculations should work. The numbers are Java double values. Dave Sand
By
Dave Sand
·
#154438
·
|
Locked
Re: Timetabling
#timetable-tool
Thanks Dave.? Sounds good. Since Ullapool is 64 miles from Inverness will the calculations cope with 337920!? Wick is rather more at about 162 or 855360!
By
Iain
·
#154437
·
|
Locked
Re: setting up version 4.12
You need to do the equivalent for your USB-Serial device, which will depend on the specific device you have. The installation stuff for that should be on the USB-Serial device maker's website. If you
By
Nigel Cliffe
·
#154436
·
|
Locked
Re: setting up version 4.12
Thanks Dave, I neglected to mention I am using a Power Pro command station, the instructions only mention a power cab. Do any of these instructions change due to that? Thanks again, Perry
By
wpsquier@...
·
#154435
·
|
Locked
Re: Timetabling
#timetable-tool
Iain, The Timetable tool can do prototype timetable calculations. Set the scale to 1 using the Custom scale selection, the fast clock speed to 1, and enter the distances in feet (or meters if metric
By
Dave Sand
·
#154434
·
|
Locked
Re: MQTT Connection in JMRI
Here¡¯s a concrete proposal to consider. _Please_ add/change/remove until we can get some kind of consensus! Happy to work during the holidays on whatever emerges. Bob Proposed updates to the JMRI
By
Bob Jacobsen
·
#154433
·
|
Locked
Re: JMRI Locking up
The panel has 7 non contigious blocks in it. Bustdale Jctn Main Down Crossover, Bonton Platform 1 crossover, Bonton main up depart, Bonton Main Up, Bonton Goods, Bustdale Junction Main Down Approach,
By
Steve_G
·
#154432
·
|
Locked
Re: possible bug, LocoNet slot monitor
What kind of things could you do with the filter(s)? I.e. what could it filter on? -- Bob Jacobsen rgj1927@...
By
Bob Jacobsen
·
#154431
·
|
Locked
Re: Timetabling
#timetable-tool
Thanks Ken. My timetable is in a spreadsheet format, but I have never worked out how to use that data to produce a graph of upward and downward lines for the various trains. Station dwell times are
By
Iain
·
#154430
·
|
Locked
Re: JMRI Locking up
thanks Cliff. The panel now loads up and I'll see how it goes from here..While i have used Atom to do some editing, it was on another version of the file and saved under another name. This was done to
By
SwissChris
·
#154429
·
|
Locked
Re: Timetabling
#timetable-tool
Iain, I've used the graphing feature of Excel to create and manage timetable construction. The graphs are the line trace with sloping lines for train movements and horizontal when a train is at a
By
Ken Cameron
·
#154428
·
|
Locked
Timetabling
#timetable-tool
Sorry, but there needs to be a bit of explanation before I ask my question.... ? I am fascinated by the operational aspects of railways. My layout is a minute "might have been" fraction of the North
By
Iain
·
#154427
·
|
Locked
Re: CROSSOVERS AND OTHER FORMATIONS
The debate seems to revolve round whether you want an accurate picture of the layout or an abstract control panel.? I am an old style signal man and appreciate the latter.? There is nothing "right"
By
Iain
·
#154426
·
|
Locked
Re: CROSSOVERS AND OTHER FORMATIONS
Fraser, The excellent work done on the Icons makes their use easier to follow. The Double slip is not a problem since it can be treated much like a Crossover. You still have only two routes that can
By
Dave Roberts
·
#154425
·
|