I have never used Operations.
But if you have a track with removable cassettes, why not set the
track length to a much higher value, for example 24 cars?
Daniel
On 2025-03-19 22:20, Ken Heywood via
groups.io wrote:
toggle quoted message
Show quoted text
My staging cassette will accept maybe six 40ft boxcars.
I'd like my daily turn to drag more than just six cars to
staging.
Right now, ops build will only populate a train for that
staging "track" capacity.
Has someone developed a strategy to select multiple cassettes
for destination rather than the default empty one?
I tried to figure out using "alternate" track but mind twists
in a knot.
?
The cassette is designated "staging".
Should it be designated something else to enable a strategy?
--
Ken
NYNH&H, Old Colony Division, Cape Cod Branch (1949-1959)
Loconet * JMRI 5.11.4 * OSX,Win10,Ubuntu
Blog: ?
Youtube: