¿ªÔÆÌåÓý

ctrl + shift + ? for shortcuts
© 2025 Groups.io

Re: Straightlining lumber


 

¿ªÔÆÌåÓý

Hi Glen
Why not just joint them than batch a bunch together and plane to width or let the moulder do it.
We I assume are just talking 16¡¯ 1¡± and less than 25# a price ?even if 2¡± not so much so no big deal.

martin/campshure/co/llc
mac campshure
7412 elmwood ave.
middleton, wi 53562-3106
608-332-2330?cell

Designing and building for 50 years


On Mar 23, 2021, at 6:16 AM, imranindiana via groups.io <imranindiana@...> wrote:

?
Glen,

The video Jonathan shared shows how to make one. I would add few observations from my use of one.

First I made mine with thin ply on each side of 1/2¡± spacers. Being 12¡¯ long I added 4¡¯ length on opposing ends so the joint is offset. I believe it is 3/4¡± thick but not sure if it would be substantially stiffer if I used 1¡± thick wood between plys. It is about 14¡± wide. I do have two ~2¡± wide continuous runs of wood (lengthwise) between plys that line up with 2 slots in the slider.

People with short slider like 76¡± on my KF700 may benefit from having the runner that is captured in slider slot, that is how I did mine. It prevents the sled from lifting but down side is that you have to thread the sled in the slot as opposed to just dropping it down.

Working alone with long pieces it helps to have a stop block screwed on the leading end with a nail in it. I push end grain of the board into nail to fix that end and then move to the trailing end to adjust it without having the leading end move on me.

Now that I have 10¡¯ slider, there is not a great chance of lifting besides 16¡¯ sled is too long to thread.?I will likely experiment with a fixed runner secured in the slider and make sled out of solid material as apposed to box construction of my current sled. One advantage is that it is easier to support the sled with flat bottom (runner not attached to the bottom of the sled). You will need to support the sled if it goes 3¡¯ (just a guess but there about) or more off of the slider. For this reason I lock my slider in middle so support stands stay in one place as sled is moved.

The advantage of solid board vs my box construction is that one can use the dovetail hold downs as shown in video. My original hold downs were just scraps of wood holding down the long edge not being cut. I later added Kreg hold downs with a captured T bolt that is recessed into the bottom surface of sled. With 2 sets of T bolt holes I can handle narrow and wide boards.

Imran

On Mar 23, 2021, at 12:32 AM, Glen Christensen <grchris1966@...> wrote:

?In my great ability to take on jobs that are over my head, I got a new one today.
I am going to run 2400 of T&G siding. coming to the conclusion that try to do this is going to be down right impossible with my tools my fellow woodworking buddy will run it for me if I pay him for the knives a hundred bucks for wear and tear on the machine and a case of beer. So i need to straight line material before i take it over and I recall that you all make a sled to run longer material than the slider. If I am correct on this , could some of you share a picture of what you built so I can wrap my head around it. My slider is 10 ft and the boards are 16 ft. There is onl 150 of them.
Then what would be the best way to slice the oppisite side?
Thank You all as always.
Glen

Join [email protected] to automatically receive all group messages.