The wiring of these
new turnouts is a development of both the Insulfrog and Electrfrog designs. The stock rails are wired to the center rails at the factory, which in turn are connected to the corresponding frog-rail. This means the turnout is completely live(except for the tip
of the frog) with no extra wiring required. If the turnout is being used as a switch to isolate a section of track then it is a simple job to remove the wire that joins the center rail and stock rail?and it will work like a current Insulfrog.