The easy way for signaling is to make the turnout and points part of the mainline signal block leading up to it. Both of the tracks leading away from the frog should be isolated and start the next signal blocks. If one of them is a siding it does not need to be separately sensed. Your signaling logic may want to include the turnout position.
DonV