开云体育

Re: Anyone Have a Schedule Strategy to Put Long Train Into Multiple Staging Cassettes? #operationspro


 

What the software thinks and what the operator does are two different things.
I think I will set one cassette at double capacity and keep one as "overflow".
I'll leave the other cassettes at configured length.
If OpsPro builds a train destined for that long cassette, it will be the yardmaster to put the extras on the overflow cassette.
When a build must use the "big" cassette, the yardmaster will need to pull both cassettes.
The "shorter" cassettes will add a bit of variety to the local freight.
--
Ken
NYNH&H, Old Colony Division, Cape Cod Branch (1949-1959)
Loconet * JMRI 5.11.1 * OSX,Win10,Ubuntu
Blog: ?
Youtube:

Join [email protected] to automatically receive all group messages.