At 6:01 PM +0000 7/16/02, original_black_bart wrote:
Based on predefined first and last speed steps, which are picked
through trial and error, the spreadsheet calcuates CV values for the
26 remaininig speed steps. These values are based on a logrithmic
curve that, when set-up in the speed table, result in a gradual
increase in speed from low to high end.
I've added a couple of buttons to:
*) Set the curve back to the default 0 -> 255 straight line
*) Set it to a straight line between existing endpoints
*) Set it to a log curve between existing endpoints.
Now that I've got the mechanism set up, adding additional adjustments is pretty easy.
Bob
--
--------------
Bob Jacobsen (Bob_Jacobsen@..., 510-486-7355, fax 510-495-2957)