开云体育

Locked Double Slip Problems #layouteditor


 

I am having problems with two Double Slips - P2a/1b and P10/9. I have carried out checks on P10/9 it down to the Layout editor to map where the problem potentially lies and have narrowed the Layout Editor. Please find the pictures describing this at?/g/jmriusers/album?id=231878.
The panel is in the background, The Turnout Table is at the top with only the turnouts of interest visible. Below and to the left is the MERG FCU showing the received messages on CBUS and the fial window is the MERG CBUS Console.
I have posted the events as they progresed through the check. The first image describes how I set the Double Slip - both P10 and P9 in the Closed condition (Branch to Platform 3.) At every stage I checked the physical state on the layout and confirmed that this, and the messages, conformed with my expectations (Note: I did add two sensors to P9? to check if there was any quirk.As can be seen, and from I described above, P9 is not acting as it should.
Just for the record, I have made extensive changes having previously set the turnouts to Internal addresses and converted these to MERG Node addresses. These changes may have caused problems within JMRI. I also realise that I need to tidy up to create a consistent approah throughout.
My current panel file can be found here.?
Thanks for reading?
Peter

Join [email protected] to automatically receive all group messages.