Thanks Dave,
I'll watch out for that when I'm ready to implement.
Andy
toggle quoted message
Show quoted text
On 11/27/2018 4:29 PM, Dave Sand wrote:
Andy,
The short answer: JMRI does not.
As far as JMRI knows, it is just two parallel tracks. Since only one train can be in the gauntlet it needs to be protected like a single track line.
The initial inclination is to treat the gauntlet as one block. That leads to a lot of potential issues relating to block routing, signaling and automation.
It is a lot cleaner to declare the gauntlet as two blocks. Depending on the requirements this may require Logix. For basic signaling the SSL or SML needs to look at both blocks.
Dave Sand
On Nov 27, 2018, at 5:55 PM, Andy Reichert <andy_r@...> wrote:
Just an off the wall thought from a not yet active user, triggered by this thrread
Hows does JMRI view gauntlet track sections?
Andy
---
This email has been checked for viruses by AVG.