¿ªÔÆÌåÓý

ctrl + shift + ? for shortcuts
© 2025 Groups.io
Date

Re: Kappa 400 has arrived

 

Thanks for all the comments, I have greatly appreciated this group and have spent many hours researching all the options. The technician opened up the


Re: Kappa 400 has arrived

 
Edited

Imran,

That looks exactly like my electrical cabinet, gasket and all...? Those are definitely for wire management.? The wiring inside mine looks exactly the same including how the red wires go up the saw on the left hand side!

will it go through this time???


Re: Kappa 400 has arrived

 

¿ªÔÆÌåÓý

Once again beautiful shop and saw.

Electrical cabinet has a gasket, nice?. In the electrical cabinet, what is the purpose of what looks like shelving and partitions. Since everything is on DIN Rail, I can only imagine it is for wire management.

Imran?

On Aug 5, 2021, at 4:11 PM, JP Rice via groups.io <jprphotos@...> wrote:

?Well after 8 months of waiting my new Kappa 400 X-Motion to arrive I got it commissioned by FELDER yesterday. Actually had two technicians do the commissioning, one was being trained. They did a great job and I was very pleased with the outcome. A friend of mine actually received the saw at his business and brought it over to my shop last week and set it in place for me. Friends with forklifts are a wonderful thing. Really looking forward to putting it to work tonight, I have been without a saw since last Jan. when I sold my K500. I took advantage of the downtime to reconfigure my shop in preparation for this day. Upgraded the lighting, had Phase Perfect unit installed and electrical run for the saw, had floors epoxy coated, cleared out many things that took up too much floor space and completely re-did my ductwork with new ducting from Blastgate Company.?
.?
<47D8FF86-B927-4C1C-88AF-E68995E13355.jpeg>
<BB80D6B0-152E-4475-8EB9-5CA72155D58B.jpeg>
<043B9CBB-659D-4445-A44F-406BF9A6D649.jpeg>
<3D4851FA-F2E1-4B26-9A4D-F4606C5ACBB0.jpeg>
<C5BDB58B-5174-48D0-A734-BCDB626CD902.jpeg>
<C567B677-0307-4CAF-A607-ABAF07252F67.jpeg>


Re: Kappa 400 has arrived

 

¿ªÔÆÌåÓý

Congratulations.? That's a nice saw.? Your shop is beautiful.? ?Well laid out.?

Take care?
John





-------- Original message --------
From: "JP Rice via groups.io" <jprphotos@...>
Date: 8/5/21 4:11 PM (GMT-05:00)
Subject: [FOG] Kappa 400 has arrived

Well after 8 months of waiting my new Kappa 400 X-Motion to arrive I got it commissioned by FELDER yesterday. Actually had two technicians do the commissioning, one was being trained. They did a great job and I was very pleased with the outcome. A friend of mine actually received the saw at his business and brought it over to my shop last week and set it in place for me. Friends with forklifts are a wonderful thing. Really looking forward to putting it to work tonight, I have been without a saw since last Jan. when I sold my K500. I took advantage of the downtime to reconfigure my shop in preparation for this day. Upgraded the lighting, had Phase Perfect unit installed and electrical run for the saw, had floors epoxy coated, cleared out many things that took up too much floor space and completely re-did my ductwork with new ducting from Blastgate Company.?
.?


Re: Kappa 400 has arrived

 

I did not know Santa was coming early this year, I should have asked for mo


Re: Kappa 400 has arrived

 

JP,

Very nice indeed!? I am jealous, as I am still waiting on my PP to arrive.? Love the floors and your space.? Enjoy using


Re: Kappa 400 has arrived

 

That's a beautiful from every angle! Congrats! Are you sure that isn't a surgical operating room? Lol.?


On Thu, Aug 5, 2021, 3:19 PM Brian Lamb <blamb11@...> wrote:
Very nice! A dream shop!

Brian Lamb
blamb11@...





On Aug 5, 2021, at 1:11 PM, JP Rice via <jprphotos@...> wrote:

Well after 8 months of waiting my new Kappa 400 X-Motion to arrive I got it commissioned by FELDER yesterday. Actually had two technicians do the commissioning, one was being trained. They did a great job and I was very pleased with the outcome. A friend of mine actually received the saw at his business and brought it over to my shop last week and set it in place for me. Friends with forklifts are a wonderful thing. Really looking forward to putting it to work tonight, I have been without a saw since last Jan. when I sold my K500. I took advantage of the downtime to reconfigure my shop in preparation for this day. Upgraded the lighting, had Phase Perfect unit installed and electrical run for the saw, had floors epoxy coated, cleared out many things that took up too much floor space and completely re-did my ductwork with new ducting from Blastgate Company.?
.?<47D8FF86-B927-4C1C-88AF-E68995E13355.jpeg><BB80D6B0-152E-4475-8EB9-5CA72155D58B.jpeg><043B9CBB-659D-4445-A44F-406BF9A6D649.jpeg><3D4851FA-F2E1-4B26-9A4D-F4606C5ACBB0.jpeg><C5BDB58B-5174-48D0-A734-BCDB626CD902.jpeg><C567B677-0307-4CAF-A607-ABAF07252F67.jpeg>


Re: Kappa 400 has arrived

 

¿ªÔÆÌåÓý

Congratulations!! ?Great looking saw and shop.?

Steve Lyde

On Aug 5, 2021, at 3:15 PM, Bill Belanger <Bill@...> wrote:

?
Beautiful shop!!!

Bill B¨¦langer

On Thu, Aug 5, 2021 at 14:11 JP Rice via <jprphotos=[email protected]> wrote:
Well after 8 months of waiting my new Kappa 400 X-Motion to arrive I got it commissioned by FELDER yesterday. Actually had two technicians do the commissioning, one was being trained. They did a great job and I was very pleased with the outcome. A friend of mine actually received the saw at his business and brought it over to my shop last week and set it in place for me. Friends with forklifts are a wonderful thing. Really looking forward to putting it to work tonight, I have been without a saw since last Jan. when I sold my K500. I took advantage of the downtime to reconfigure my shop in preparation for this day. Upgraded the lighting, had Phase Perfect unit installed and electrical run for the saw, had floors epoxy coated, cleared out many things that took up too much floor space and completely re-did my ductwork with new ducting from Blastgate Company.?
.?
<47D8FF86-B927-4C1C-88AF-E68995E13355.jpeg>
<BB80D6B0-152E-4475-8EB9-5CA72155D58B.jpeg>
<043B9CBB-659D-4445-A44F-406BF9A6D649.jpeg>
<3D4851FA-F2E1-4B26-9A4D-F4606C5ACBB0.jpeg>
<C5BDB58B-5174-48D0-A734-BCDB626CD902.jpeg>
<C567B677-0307-4CAF-A607-ABAF07252F67.jpeg>


Re: Kappa 400 has arrived

 

¿ªÔÆÌåÓý

Very nice! A dream shop!

Brian Lamb
blamb11@...
www.lambtoolworks.com




On Aug 5, 2021, at 1:11 PM, JP Rice via <jprphotos@...> wrote:

Well after 8 months of waiting my new Kappa 400 X-Motion to arrive I got it commissioned by FELDER yesterday. Actually had two technicians do the commissioning, one was being trained. They did a great job and I was very pleased with the outcome. A friend of mine actually received the saw at his business and brought it over to my shop last week and set it in place for me. Friends with forklifts are a wonderful thing. Really looking forward to putting it to work tonight, I have been without a saw since last Jan. when I sold my K500. I took advantage of the downtime to reconfigure my shop in preparation for this day. Upgraded the lighting, had Phase Perfect unit installed and electrical run for the saw, had floors epoxy coated, cleared out many things that took up too much floor space and completely re-did my ductwork with new ducting from Blastgate Company.?
.?<47D8FF86-B927-4C1C-88AF-E68995E13355.jpeg><BB80D6B0-152E-4475-8EB9-5CA72155D58B.jpeg><043B9CBB-659D-4445-A44F-406BF9A6D649.jpeg><3D4851FA-F2E1-4B26-9A4D-F4606C5ACBB0.jpeg><C5BDB58B-5174-48D0-A734-BCDB626CD902.jpeg><C567B677-0307-4CAF-A607-ABAF07252F67.jpeg>


Re: Kappa 400 has arrived

 

Beautiful shop!!!

Bill B¨¦langer

On Thu, Aug 5, 2021 at 14:11 JP Rice via <jprphotos=[email protected]> wrote:
Well after 8 months of waiting my new Kappa 400 X-Motion to arrive I got it commissioned by FELDER yesterday. Actually had two technicians do the commissioning, one was being trained. They did a great job and I was very pleased with the outcome. A friend of mine actually received the saw at his business and brought it over to my shop last week and set it in place for me. Friends with forklifts are a wonderful thing. Really looking forward to putting it to work tonight, I have been without a saw since last Jan. when I sold my K500. I took advantage of the downtime to reconfigure my shop in preparation for this day. Upgraded the lighting, had Phase Perfect unit installed and electrical run for the saw, had floors epoxy coated, cleared out many things that took up too much floor space and completely re-did my ductwork with new ducting from Blastgate Company.?
.?


Kappa 400 has arrived

 

Well after 8 months of waiting my new Kappa 400 X-Motion to arrive I got it commissioned by FELDER yesterday. Actually had two technicians do the commissioning, one was being trained. They did a great job and I was very pleased with the outcome. A friend of mine actually received the saw at his business and brought it over to my shop last week and set it in place for me. Friends with forklifts are a wonderful thing. Really looking forward to putting it to work tonight, I have been without a saw since last Jan. when I sold my K500. I took advantage of the downtime to reconfigure my shop in preparation for this day. Upgraded the lighting, had Phase Perfect unit installed and electrical run for the saw, had floors epoxy coated, cleared out many things that took up too much floor space and completely re-did my ductwork with new ducting from Blastgate Company.?
.?


Re: phase perfect 30hp

 

I'm interested in that ..?


On Thu, Aug 5, 2021 at 7:24 AM <prestonvinzant@...> wrote:
4 year old phase perfect 30 hp. used for maybe 200 hours. 3000$ houston tx?
prestonvinzant@...
8325297388


Re: VFD

 

Dang it...2 years too early for my needs.
Dave Davies

On Thu, Aug 5, 2021 at 9:24 AM <prestonvinzant@...> wrote:
i have a phase perfect 30hp i need to sell?



--
Dave & Marie Davies

318-219-7868


phase perfect 30hp

 

4 year old phase perfect 30 hp. used for maybe 200 hours. 3000$ houston tx?
prestonvinzant@...
8325297388


Re: VFD

 

i have a phase perfect 30hp i need to sell?


Re: 20" jointer planer format 4 dual 51

 

brett i will call you tomorrow it is past 10pm here. just got the post message.


dual 51 format 4 sale

 

hello all i have a 4 yr old dual 51 format 4 3 phase 10 hp for sale. asking 15k needs a little work electrical planer height electrics but was well kept and garaged in ac. 8325297388 located in houston tx. on laptop so hard to get photos you can email me or text me. prestonvinzant@....?


Re: Twisted fence on AD 941 #jointerplaner #jpsetup

 

¿ªÔÆÌåÓý

hkimsey,

I assume Felder makes most fine. If memory serves, I have seen less than a dozen complaints here of cupped jointer fences across the width over close to 20 yrs.

I know the slider on the saw is much more substantial extrusion but Felder makes them in 12¡¯ lengths per flat. It is the flattest surface in my shop. I assume that experience likely transfers to jointer fence extrusion as well.

Imran

On Aug 4, 2021, at 10:48 PM, hkimsey@... wrote:

?Yes Imran, it appears to be cupped across its width. ?I¡¯m curious how many have seen this, particularly on all the new fancy bandsaw fences.


Re: Twisted fence on AD 941 #jointerplaner #jpsetup

 

Yes Imran, it appears to be cupped across its width. ?I¡¯m curious how many have seen this, particularly on all the new fancy bandsaw fences.


Re: Older AD 531 doesn¡¯t power up! #jointerplaner #wiring

 

I¡¯ve been suspicious of planers that don¡¯t have bed rollers but I like not having another micro adjustment to do!