I have couple of question regarding phase perfect installation. (PTE10 if that matters)

I have two machines close to each other.

One is 3-phase and one is 1-phase. I will only run 1 machine at a time.

I thought to save some wires and use 1 leg of the 3 phase to run the single phase convertor. Is it something that is feasible?

If not, does the PP box has enough space to place a power distribution block before the input to the convertor?