Re: ZIEHL STW1K S225636 Dust Collector Control Module #dustcollection


 

¿ªÔÆÌåÓý

Mitch,

You can connect power to A1 & A2. do not connect any thing to dust collector. Confirm 15 & 16 are shorted and there is an open between 15 & 18.

Now turn a machine on that has the coil installed. You should be able to verify that 15 & 18 are now shorted and there is an open between 15 & 16.

This is what the dust collector switch needs to turn the DC on.

Imran

On Jan 9, 2021, at 9:39 PM, imranindiana via groups.io <imranindiana@...> wrote:

?

Mitch,

?

This is best I can think of. Maybe someone here will confirm. Run it by Felder before implementing it.

<image001.png>

Imran

?

?

From: [email protected] On Behalf Of cmluck01
Sent: Saturday, January 09, 2021 8:12 PM
To: [email protected]
Subject: Re: [FOG] ZIEHL STW1K S225636 Dust Collector Control Module #dustcollection

?

Imran,

?

The dust collector motor is single phase and thus uses just two of the available 3 input lines at the contactor. The contactor is controlled by 240V for switching on/off.

?

Thanks,

Mitch

?

?

On Sat, Jan 9, 2021 at 7:21 PM imranindiana via <imranindiana=[email protected]> wrote:

cmluck,

?

I assume your dust collector motor is 3 phase since you mention it is controlled by a 3 phase contactor. How is this contactor switched? 110AC or 220AC or some DC voltage?

?

I can at least recommend something that you should run by felder before trying.

?

From PN you have 220-240VAC model.

?

Imran?


On Jan 9, 2021, at 4:29 PM, cmluck01@... wrote:

?Greetings to all,
I recently purchased, from Felder, a ZIEHL STW1K S225636 Dust Collector Control Module along with a few of the ZIEHL STWA1 Coil Transformers to control my dust collector. This module controls up to 8 machines and uses the coil transformers to activate a relay in the STW1K to turn on the dust collector. When the individual machines (say a saw or planer), are powered off, then the dust collector will too be turned off, following a short delay. If anyone is familiar with this setup, I could use some help on the wiring. I am unsure of the connections at A1, A2, 16, and 18. See photos and wiring diagrams. For reference, I'm running a Felder K940 5.5 KW 3 phase slider and Felder AD951 3 phase Jointer/Planer 7.5 KW via a Phase Perfect 20 HP. My Dust collector has a 5HP with Baldor motor with a 3 Phase contactor for on/off. Any input is appreciated. Thanks

<IMG_3486.jpg>

<IMG_3160.jpg>

<IMG_3159.jpg>

<IMG_3158.jpg>

Join [email protected] to automatically receive all group messages.