Hi
?
I am wondering if anyone has any experience with increasing the short circuit delay on the DR5033 from 96ms (default) to 300ms or more ? This is LocoNet CV 13 that is being increased on the DR5033.
?
Further, what would be the risks of doing this ?? It will take longer for the DR5003 to detect a short, and hence power will be applied for 3 times as long at the site of the short, which leads to a longer heating danger to whatever is causing the short.? Are there real risks to decoders installed in locos, etc ?? Any other risks that anyone can think of ?
?
Thank you for sharing any experience you have.
?
Jay Lennox - Toronto