¿ªÔÆÌåÓý

ctrl + shift + ? for shortcuts
© 2025 Groups.io

Re: More on spike and avalanche breakdown


 

The why the delay was done is RC into a 74HC14, 100 ohm variable and 47pf.
There were two one for the A and B phse (roughly 180 degrees opposed).

That and two device delay was to disallow pushing A side without a delay?
before pushing the B side.? Overall effect was a drive that was less than
160 degrees of the possible 180 for each leg.

--
Allison
------------------
Post online only,?
direct email will go to a bit bucket.

Join [email protected] to automatically receive all group messages.