Just wanted to remind everyone that the shore power inlet needs to be inspected on a regular interval. The stranded wires are subject to corrosion and heat build up.
One thing I have become aware of is the need to install FERRULES on the stranded wire before clamping into the shore power receptical. This aids in reducing loosening of the wire in the receptical due to vibration.
Daryl
s/y Intution - PSC # 31