I am certain you are right... if you can identify which gear is the culprit, that should be also sent to the EQMOD group who made up PECprep to add to their G11 list.??
How does that 42 sec peak compare in size to the Worm peak at 239.4 sec.? Is it anywhere near as high as that one?
(Or better for me: send me [mherman346@...] your raw PHD2 log file and I can run it in my PECprep.exe program to see its FFT.)
That 239.4/42 = 5.7.? That's a non-integer ratio and no way for PEC to treat that... it will have to be eliminated mechanically if possible, or different gears used to get it to be an integer fraction of 239.4 sec, but that sounds to me like a design problem...? ?
I would be happy to show you the 42 sec interval. i have a G11GT, and I think the tucked in motors introduce new gearing ratios (probably true for G11G as well).
This has also been confirmed by Ray with PemPro
B
--
Michael Herman mobile: 408 421-1239 email: mherman346@...