Keyboard Shortcuts
ctrl + shift + ? :
Show all keyboard shortcuts
ctrl + g :
Navigate to a group
ctrl + shift + f :
Find
ctrl + / :
Quick actions
esc to dismiss
Likes
Search
CPKC fleet status
On Wed, Jan 3, 2024 at 03:24 PM, CMQ 9020 wrote:
As of October 31, there were still 87 of the original CP units on the roster, but 44 were classified as Tied-Up Awaiting Disposition. Aside from four tied-up for some level of repairs, 39 were rated as OK for service. The oldest of those was CP 5743 (built 1975), the youngest was CP 6069 (built January 1985). The highest numbered unit, CP 6080, was still OK (that's the renumbered 5859, built February 1978). Ian Smith? ? |
On Sun, Jan 14, 2024 at 01:52 PM, Ian Smith wrote:
On Wed, Jan 3, 2024 at 03:24 PM, CMQ 9020 wrote:Tied-Up Awaiting Disposition Means awaiting rebuild? But still on the roster I can see. Last I heard CP still has the capital rebuild project with Progress Rail? |
On Sun, Jan 14, 2024 at 01:17 PM, Brian Hume wrote:
This is a pretty good list of what’s out thereThe Diesel Shop list includes OK, TUUL, TUUH, and TUWD units but still omits a lot that were still on the roster as of October 31. Units missing from the Diesel Shop list that were classed as OK as of October 31 are 5798, 5905, 6000 and 6037.? The following units are shown as "Out of Service" on the Diesel Shop list but were listed as OK by CP: 5908, 5920, 5946, 5957, 5985, 5989, 6017, 6024, 6042 and 6079. Ian Smith |
I sent an update to the DieselShop. 5920 is in service doing yard duties in Windsor ON. Ken G. On Mon, Jan 15, 2024 at 12:52?PM Ian Smith via <railsmith=[email protected]> wrote: On Sun, Jan 14, 2024 at 01:17 PM, Brian Hume wrote: |
On Mon, Jan 15, 2024 at 10:08 AM, ken garber wrote:
Update: The latest list as of December 31 is much the same, but with a few changes. 5943 is shown as at Red Deer for hydrogen conversion as of December 7 (as reported in another thread). 6000 has the notation: "Should be renumbered 5100".? (It's in the SD40-3 conversion program, as noted in the 2023 Trackside Guide.) 6009 has changed from Tied Up Light Repair to Tied up Waiting Disposal. 6061 has changed from TUWD to Tied Up Serviceable and is identified as an LNG test unit. |
开云体育I haven’t checked since mid-December, but 6061 was still at McCook, IL where EMD’s home is. McCook (“La Grange”) is where Progress Rail’s engineering department is. It has been there a few years for CNG development.Sean Graham-White On Jan 18, 2024, at 8:48 AM, Ian Smith via groups.io <railsmith@...> wrote:
|
On Thu, Jan 18, 2024 at 09:48 AM, Ian Smith wrote:
On Mon, Jan 15, 2024 at 10:08 AM, ken garber wrote:What went wrong with 6009? Still on the roster unless it gets sent to mayfield? |
Thunder Bay killed it? On Thu, Jan 18, 2024 at 6:00?PM CMQ 9020 <Orionnewflyerxn40@...> wrote: On Thu, Jan 18, 2024 at 09:48 AM, Ian Smith wrote: --
nate |
开云体育?
just a FYI
CMQ 9020 past through Revolstoke , WB 3rd on the head end of a 805, 02:10:50. It
was dropped at Geddis later on that morning . A chatter in the Revolstoke VR
chat also mentioned that it was BO Google:Baer Lordbaer FB:Ray D io Superintendent GN&DS RR |
On Mon, Jan 22, 2024 at 05:09 PM, <GNandDS@...> wrote:
What’s BO means? |
Bad Order.? On Mon, Jan 22, 2024 at 6:08?PM CMQ 9020 <Orionnewflyerxn40@...> wrote: On Mon, Jan 22, 2024 at 05:09 PM, <GNandDS@...> wrote: --
nate |
CP 5928 have been in storage for over 5 year in Montreal,? See attached photo taken just before Christmas.
On Monday, January 22, 2024, 5:02:38 PM GMT-5, CMQ 9020 <orionnewflyerxn40@...> wrote:
heard CP SD40-2 5928 was retired sometime in 2023 per a employee who works in Montreal. Don’t know if this one will go to mayfield in the near future. But still listed on the roster?
|
开云体育With all the retro liveries I would love to see a few of the rebuilds come out with the multimark.? On Jan 23, 2024, at 17:14, Brian Stevenson via groups.io <grump567@...> wrote:
|
to navigate to use esc to dismiss