¿ªÔÆÌåÓý

Locked Ignoring track lengths #operationspro


 

Hi
?Since upgrading to the latest version, JMRI seem to be ignoring track lengths. My latest build has a staging track that is 500', used is 478' and it is reserving 192 more feet. this is not the first train build to do this. There are no other trains built and an not using planned pickups.

thanks
Mike


 

Mike,

For the program to be reserving track space, there has to be a built train.? I would expect the built train to terminate into staging using the track that has the reserve value of 192 feet.

Dan


 

Dan
Yes that is correct, there was a train built. the train was leaving with 10 cars at 478 feet and returning with 15, putting it 192 feet longer than the track length. I rebuilt the route and the next build worked. This is not the first time since the update that it has overloaded random yard tracks.

Thanks
Mike


 

Mike,

I was able to fix your issue.? Mike had a local switcher that departed staging, serviced a location, and returned to staging.? The program didn't handle the staging track correctly for a local switcher, and the fix will be in the next test release.

Dan


 

Thanks Dan

Mike