Locked JMRI Operations : "Mole Yard"


 

How should a ¡°MOLE YARD¡± be treated for staging / switching I have split it into 2 yards on paper. What I want is train ¡°X¡± to come into the yard cars to track ¡°Y¡± locomotives and caboose to their respective tracks and terminated. Inbound WB cars would be used on a Outbound EB train.

I don¡¯t have outside of my A/D tracks #1 and #2 in the yard that are long enough to support a train length.

Any suggestions?

Thanks,

Mike


 

Hi Mike,
Couple of questions.
1) All tracks in Mole are single ended?
2)How many tracks in mole yard?
3)Do you have paper or real loco and caboose tracks at mole?
4) could you give me the names you are using so not to confuse anything?
You operate kind of the same way I do it works great and most importantly I never lose cars and everything moves.
Matt Greenwood
Cascade Rwy
Grant NE


 

¿ªÔÆÌåÓý

Hi Matt,

I took my ¡°mole Yard¡± and split it in half and changed the tracks to ¡°Spurs¡± and that got me a working solution I think.?

Q1 = Yes Except for the A/D tracks.
Q2 = 7 total.
Q3 = There are 3 locomotive storage tracks and 2 caboose tracks
Q4 = Created two ¡°locations¡± and the three long tracks went to location A and the 4 shorter tracks went to location B. I split the Locomotive and caboose tracks up the same way.

Thanks for the response.?

Mike

On May 28, 2019, at 1:22 PM, cascaderwy via Groups.Io <cascaderwy@...> wrote:

Hi Mike,
Couple of questions.
1) All tracks in Mole are single ended?
2)How many tracks in mole yard?
3)Do you have paper or real loco and caboose tracks at mole?
4) could you give me the names you are using so not to confuse anything?
You operate kind of the same way I do it works great and most importantly I never lose cars and everything moves.
Matt Greenwood
Cascade Rwy
Grant NE


 

Sorry I think I missed an earlier email.
Which prototype Mole is this about?

Andy

On 5/28/2019 10:26 AM, Michael Kisser wrote:
Hi Matt,

I took my ¡°mole Yard¡± and split it in half and changed the tracks to ¡°Spurs¡± and that got me a working solution I think.

Q1 = Yes Except for the A/D tracks.
Q2 = 7 total.
Q3 = There are 3 locomotive storage tracks and 2 caboose tracks
Q4 = Created two ¡°locations¡± and the three long tracks went to location A and the 4 shorter tracks went to location B. I split the Locomotive and caboose tracks up the same way.

Thanks for the response.

Mike

On May 28, 2019, at 1:22 PM, cascaderwy via Groups.Io <cascaderwy@... <mailto:cascaderwy@...>> wrote:

Hi Mike,
Couple of questions.
1) All tracks in Mole are single ended?
2)How many tracks in mole yard?
3)Do you have paper or real loco and caboose tracks at mole?
4) could you give me the names you are using so not to confuse anything?
You operate kind of the same way I do it works great and most importantly I never lose cars and everything moves.
Matt Greenwood
Cascade Rwy
Grant NE


---
This email has been checked for viruses by AVG.


 

Thanks Mike,
So there are 2 double ended tracks for trains, 7 single ended tracks for car storage, and then an actual loco and caboose tracks the number doesn't matter as long as they will hold the equipment at the mole, is this correct?
I think I know where you are headed but I can't wrap my head around how.
I think I can make it work with a few changes.
I would start with:


A) Locations
1)Mole arrival
2) mole departure
3) mole yard
4) engine and caboose would be part of mole yard


B) track type and name
1) name) arrival would be staging so that would activate the take feature
2) name) departure would be staging same thing take all
3) name) yard needs set to be set either yard so the load status changes or I/C if you don't want to change loads;make sure the 7 yard tracks won't accept loco's or cabeese?
4) name loco)??loco track only accepts loco
5) name caboose) caboose track only accepts cabooses.

this should take care locations track names track type restrictions
does this work so far

my next question is this a manned location during operations and do you want that crew to have something to do ie be the rest of the world
like on mine it is not manned during ops it is manned by the road engineer does all the work switch crew and locals don't get that far I have a short mainline ( heavy on switch jobs) so this equalizes the work load
but is manned during solo ops because there is no one here to play

I am doing this in pieces cause I'm still working out details

Matt G


 

¿ªÔÆÌåÓý

Matt,?

My email is mkisser@... let¡¯s take this off line. I am glad to share more of what I have done. Maby we can work together to help each other out.?

Mike


On May 28, 2019, at 4:55 PM, cascaderwy via Groups.Io <cascaderwy@...> wrote:

Thanks Mike,
So there are 2 double ended tracks for trains, 7 single ended tracks for car storage, and then an actual loco and caboose tracks the number doesn't matter as long as they will hold the equipment at the mole, is this correct?
I think I know where you are headed but I can't wrap my head around how.
I think I can make it work with a few changes.
I would start with:


A) Locations
1)Mole arrival
2) mole departure
3) mole yard
4) engine and caboose would be part of mole yard


B) track type and name
1) name) arrival would be staging so that would activate the take feature
2) name) departure would be staging same thing take all
3) name) yard needs set to be set either yard so the load status changes or I/C if you don't want to change loads;make sure the 7 yard tracks won't accept loco's or cabeese?
4) name loco)??loco track only accepts loco
5) name caboose) caboose track only accepts cabooses.

this should take care locations track names track type restrictions
does this work so far

my next question is this a manned location during operations and do you want that crew to have something to do ie be the rest of the world
like on mine it is not manned during ops it is manned by the road engineer does all the work switch crew and locals don't get that far I have a short mainline ( heavy on switch jobs) so this equalizes the work load
but is manned during solo ops because there is no one here to play

I am doing this in pieces cause I'm still working out details

Matt G


 

Mike
this stupid box won't let me follow the email addy my addy is cascaderwy@...
Matt


 

mike if it did not work try
cascaderwy at yahoo dot com
matt