¿ªÔÆÌåÓý

Locked Operations with Staging yard


 

¿ªÔÆÌåÓý

Here is how I solved it where the length of the track is limited and so the switcher could not put cars back on the track until I added another track the same length.

?

This is a separate location (Red Bluff-1) from the industries (Red Bluff industries)

?

?

Switcher Route looks like this:

?

?

?

At another location where my interchange track was longer than needed for setouts and pickups, this was not needed. ?However, in Red Bluff I wanted the program to limit how many cars were set out on the interchange track after crews complained about too much work in that location.

?

Hope this helps,

?

Gary Ray


Virus-free.