Keyboard Shortcuts
ctrl + shift + ? :
Show all keyboard shortcuts
ctrl + g :
Navigate to a group
ctrl + shift + f :
Find
ctrl + / :
Quick actions
esc to dismiss
Likes
Search
Locked Operations with Staging yard
¿ªÔÆÌåÓýHere is how I solved it where the length of the track is limited and so the switcher could not put cars back on the track until I added another track the same length. ? This is a separate location (Red Bluff-1) from the industries (Red Bluff industries) ? ? Switcher Route looks like this: ? ? ? At another location where my interchange track was longer than needed for setouts and pickups, this was not needed. ?However, in Red Bluff I wanted the program to limit how many cars were set out on the interchange track after crews complained about too much work in that location. ? Hope this helps, ? Gary Ray |
to navigate to use esc to dismiss