Keyboard Shortcuts
ctrl + shift + ? :
Show all keyboard shortcuts
ctrl + g :
Navigate to a group
ctrl + shift + f :
Find
ctrl + / :
Quick actions
esc to dismiss
Likes
Search
Photo 20211123_164336.jpg updated
#photo-notice
[email protected] Notification
The following photos have been updated in the KD 122 italy two album of the [email protected] group. By: Multihull Dynamics <pat@...> |
have no problem finding aluminum tubes in Italy. For the tubes of the Duo 900, two 180mm and two 100mm tubes arrived in 20 days. 6m long pipes with diameter from 60mm to 200mm there are no problems.
We had thought of using 120mm x 5mm tubes by positioning the mast vertically and fixing it with two stays at the stern of the two hulls. We go over 150kg
?
Now we are directing a composite structure, putting 120mm PVC pipes inside, closing with 6mm oval shaped marine plywood and then carbon fiber and glass coating.
Hi Bernd |
Hi Domenico Do you know that you can not glue PVC material, besides PVC to PVC? Use good laminated wood instead. Cheers Bernd
Le lundi 29 novembre 2021, 00:33:42 UTC+1, domenicodispaldro@... <domenicodispaldro@...> a ¨¦crit :
Insert empty PVC pipes inside, starting from the base with the 120mm, center 100mm and in the end 80mm divided to the length of 13m.
I show you a drawing as I thought of it.
Hello
|
Hi Bernd I have posted more photos on the construction of the KD122, works which include carbon fiber, fiberglass and antivortex fin installation.
On 10 January 2022 we start with the hull finishing with peel ply and then we turn the hulls for the continuation.
Meanwhile in the last days before the break I started drawing and cutting a section of the mast A-frame, I open a new topic on the construction of the mast.
Bye |
to navigate to use esc to dismiss